Центр продуктов
Другие продукты
Global-CE > Полная обсадная установка > TYSIM Полная обсадная установка > TYSIM Casing Rotator Полная обсадная установка
TYSIM Casing Rotator Полная обсадная установка

TYSIM Casing Rotator Полная обсадная установка

Диаметр бурения:
2000-3200 mm
Крутящий момент:
9080/5368/3034 kN.m
Вес:
96ton
Просмотреть полную информацию

Характеристики продукта

Biggest Type Casing Rotator for 2000 to 3200mm Pile Dia. KTR3205H

TYSIM Casing Rotator, Special use wedge clampling device.

Being Compared with the traditional clampling mechanism, it can clamp the casing no matter at what position, and keep the vertical accuracy of the casing; and the larger drawing resistance of casing causes greater lamp force.

1.Competitive Advantage

(1) No noise, no vibration, and high safety.

(2) Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;

(3) During construction drilling, the characteristics of stratum and rock can be directly distinguished;

(4) The drilling speed is fast and reaches about 14m/h for the general soil layer;

(5) The drilling depth is large and reaches about 80m according to the situation of soil layer;

(6) The hole forming verticality is easy to master, which can be accurate to 1/500;

(7) No hole collapse will be caused, and the hole forming quality is high;

(8) The hole forming diameter is standard, with little filling factor. Being compared with other hole forming methods, it can save a lot of concrete usage;

(9) The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.

2. Specifications

9080/5368/3034 kN.m

Instantaneous 10593

3. Description

Use for different types construction:

(1) Foundation pile, continuous wall

Foundation piles for high-speed rail, road and bridge and house building;

Articulation pile constructions which are required to be excavated, such as subway platforms, underground architectures, continuous walls.

Water retaining wall of reservoir reinforcement.

(2)Drilling gravels, boulders and karst caves

It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder formations.

It is allowable to conduct operation and cast the foundation piles at the thick quicksand formation and necking down stratum or the filling layer.

Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.

(3) Clear the underground obstructions

During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the foundation pile on the spot.

(4) Cut the rock stratum

Conduct the rock-socketed drilling to the cast-in-place piles.

Drill through-holes on the rock bed(shafts and ventilation holes).

(5) Deep excavation

Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement.

Excavate deep wells for construction use in the constructions of reservoir and tunnel.

Параметр продукта

Технические параметры
Drilling Diameter 2000-3200 mm
Torque

9080/5368/3034 kN.m

Instantaneous 10593

Rotary speed 0.6/1.0/1.8
Lower Pressure of sleeve Max. 1100kN+Dead Weight 600 kN
Pulling fore of sleeve 7237kN, Instantaneous 8370 kN
Pressure pulling stroke 750 mm
Weight 96ton
Параметры гидравлической электростанции
Engine Model Cummins QSM11-335x2
Engine Power 2x272/1800 kw/rpm
Fuel Consumption of Engine 2x216 g/kwh( Max. power rate)
Weight 13 ton
Control Mode Wired remote control

Отправить запрос

Соединить с TYSIM
Я хочу цитаты для
Идентификатор электронной почты
Ваша страна
Пожалуйста выберите
Имя
Номер телефона
- -
РАЗМЕСТИТЬ
Соединить с TYSIM
Я хочу цитаты для
Идентификатор электронной почты
Ваша страна
Пожалуйста выберите
Имя
Номер телефона
- -
РАЗМЕСТИТЬ

Сопутствующие товары, которые могут вас заинтересовать

Полная обсадная установка родственные бренды

Уведомление об авторских правах © 2002-2024 global-ce.com