Sunward SWDP120H Полная обсадная установка
Характеристики продукта
▲ The only pipe pile follow while drilling construction method in China(Medium excavation method)Piling machinery for construction。
▲ Large-diameter prefabricated pipe pile capable of being placed(The outer diameter is greater than 80cm),The pile forming quality and the pile bearing capacity are greatly improved。The soil squeezing effect caused by the construction of the static pressure pile is solved,Unable to drive pile into rock face,The large-diameter pipe pile cannot be pressed in and the like.。
▲ Rock can be penetrated with special drilling tool,Placing precast tubular piles on moderately weathered rock surfaces,And that bear capacity of the pile is improved。
▲ Easily deal with complex geology,No casing is required、Mud wall protection,The construction is simple,Green and environmental protection。
▲ Equipped with hydraulic vibration hammer,Enriching construction means。
▲ Wireless remote control is available for all actions of equipment construction.,Greatly improve the accuracy and safety of operation。
▲ Adopt advanced control system,Reliable performance,Energy saving and consumption reduction。