Характеристики продукта
1、Strong lifting operation capability:
①The comprehensive lifting performance is higher than that of the same tonnage product.;
②Shield hoisting:Main arm 24m+Jib 9m,Amplitude 12m,Lifting capacity 173t,Load rate 86.7%(Lifting weight 150t);
③Hoisting of bridge column:Main arm 36m,Amplitude 12m,Lifting capacity 176t,Load rate 90.9%(Lifting weight 160t);
④Wind power hoisting:The main arm 106m+Jib 7m,Amplitude 18m,Lifting capacity 80.5t,Load rate 86%(Lifting weight 70t)。
2、Convenient and efficient disassembly and assembly transfer:
①Body weight、The left and right track frames can realize complete self-loading and unloading.,Pull up with one key,One key to thread the rope;
②Host**Transportation weight of large single piece 40.7t,Transport width 3m,Transport height 3.2m;
③Boom can be packaged for transportation。
3、New and comfortable control cabin:
①View、Large operating space、Air outlet of omni-directional air conditioner,Cozy、Cool indoor temperatures;
②Centralized arrangement of operation switch button,Within reach、Easy to operate。
4、First Implantation of Intelligent Functions、Improved security control:
On the phoneAPPManagement of newly added crane equipment at the end、Statistical report、Maintenance、Fault alarm、Functions such as equipment positioning and track playback,Improve equipment management level and operation efficiency。
Параметр продукта
Item Purpose |
Parameter |
|
**Large lifting capacity(t)/Magnitude(m)/Arm length(m) |
400/6/24(Standard) 400/12/30(Chaoqi) |
|
**Large lifting torque |
2360(Standard) 5200(Chaoqi) |
|
Length of main boom(m) |
24~84 |
|
Length of light boom of main boom(m) |
72~102(Standard) 78~126(Chaoqi) |
|
Fix the length of the jib(m) |
12 |
|
Fix the fly jib**Large lifting capacity(t) |
80 |
|
Boom length under fixed jib condition(m) |
54~84(Standard heavy arm) 54~96(Standard light arm) |
|
Length of tower jib(m) |
24~72(Standard) 24~84(Chaoqi) |
|
Tower jib**Large lifting capacity(t) |
140 (Standard) 180(Chaoqi) |
|
Working angle of main boom under tower working condition(°) |
65~85 |
|
Main boom length under tower jib working condition(m) |
30~60(Standard)36~84(Chaoqi) |
|
Main boom of tower jib working condition+Jib**Large length(m) |
60+72(Standard)84+84(Chaoqi) |
|
Wind power working condition(m) |
106+7 |
|
Reel
Single rope
Speed
|
Main lifting(m/min) |
140 |
Auxiliary lifting(Tower arm luffing)(m/min) |
140 |
|
Main luffing(m/min) |
2×50 |
|
Super-lift luffing(m/min) |
120 |
|
The goose's head rises(m/min) |
125 |
|
**Giant slalom speed(rpm) |
1.0 |
|
**Large walking speed(km/h) |
1.2 |
|
Gradeability(%) |
20 |
|
Ground specific pressure(MPa) |
0.146 |
|
Dead weight with basic arm (t) |
318 |
|
**Transportation weight of large single piece(t) |
40.7(Without masts、Winding) |
|
Hair |
Manufacturer/Model |
Weichai/WP12 |
Rated power/Rotating speed(kW/rpm) |
318/1900 |
|
**Large output torque/Rotating speed(Nm/rpm) |
2060/(1000~1400) |
|
Emission standards |
Non-road countryⅢ |