Характеристики продукта
1、Strong lifting operation capability:
1)The comprehensive lifting performance is higher than that of the same tonnage products.。
2)Wind power working conditions meet 100m3MWFan hoisting,120mOf 2.0MW~2.5MWFan hoisting。
2、Wide range of construction applications:
The working condition configuration is complete,Set special working conditions for wind power and shield,Covering wind power、Thermal power、Petrochemical、Shipbuilding、Subway、Water conservancy and other large-scale construction fields。
3、Convenient and efficient disassembly and assembly,Global transportation is available:
1)Installation and disassembly of the equipment is 20% faster than that of the peer products%。
2)Single piece**Large shipping weight 48.6t。
4、New intelligent function、Improved security control:
On the phoneAPPManagement of newly added crane equipment at the end、Statistical report、Maintenance、Fault alarm、Equipment positioning and other functions,Improve equipment management level and operation efficiency。
5、New and comfortable control cabin:
1)Full field of view、Large operating space、Air outlet of omni-directional air conditioner,Cozy、Cool indoor temperatures。
2)Centralized arrangement of operation switch button,Within reach、Easy to operate。
Параметр продукта
Project |
Numerical value |
Remark |
||
**Large lifting capacity/Magnitude |
Standard t×m |
500×6 |
|
|
Chaoqi t×m |
500×12 |
|
||
Heavy main arm |
Standard m |
24~90 |
|
|
Chaoqi m |
36~96 |
|
||
Light main arm |
Standard m |
48~108 |
|
|
Chaoqi m |
78~126 |
|
||
Dead weight with basic arm t |
370 |
|
||
Length of luffing jib m |
24~84 |
|
||
Luffing jib**Large lifting capacity |
Standard t×m |
190×13 |
|
|
Chaoqi t×m |
235×16 |
|
||
Working angle of main boom under luffing jib working condition ° |
65、75、85 |
|
||
**Long main arm+**Long luffing jib |
Standard m |
60+72 |
|
|
Chaoqi m |
84+84 |
|
||
Wind power arm under standard working condition |
Main arm m |
84~108 |
|
|
Wind power arm m |
7 |
|
||
**Large lifting capacity t×m |
126×16 |
|
||
Reel |
Main lifting m/min |
0~137 |
|
|
Single rope |
Auxiliary lifting m/min |
0~137 |
|
|
Speed |
Luffing m/min |
0~50 |
|
|
|
Jib luffing m/min |
0~123 |
|
|
|
Super-lift luffing m/min |
0~143 |
|
|
|
The goose's head rises m/min |
0~109 |
|
|
Swing speed rpm |
0~1.0 |
|
||
Travel speed km/h |
0~1.0 |
|
||
With basic main arm**Great climbing ability % |
30 |
|
||
Average grounding specific pressure with basic arm MPa |
0.139 |
|
||
Transportation dimension of the main machine is long×Wide×High mm |
12180×3345×3205 |
Without masts |
||
Single piece**Large transport weight t |
48.6 |
|
||
Engine |
Power/Rotating speed kW/rpm |
360/1800 |
|
|
Torque/Rotating speed Nm/rpm |
2200/1300 |
|
||
Emission standards |
EU Stufe 3A |
|
||
Track gauge×Grounding length×Shoe width mm |
8000×9800×1350 |
|