Характеристики продукта
Strong lifting capacity:
● Large Gauge Track Chassis Guarantee 360°Excellent overall stability in the swing range,**The large lifting moment is 209t·m,Under the condition of fixed jib**Large lifting capacity of 12.0t。
● Main arm**The large length is 52m,Main arm+Fix the fly jib**The large length is 43m+15m。
And that universality of the part is good:
Products on the same platform are common except for most electrical components and hydraulic components.,The structural members are also largely interchangeable,Uch as a fixed jib、Goose head rack、Hook、Luffing mechanism、Counterweight base, etc.,Significantly reduce purchase and maintenance costs。
Security protection is comprehensive:
Torque limiter as standard、Lifting height limiter、Main boom angle limiter、Over-discharge protection device for steel wire rope、Amplitude-variable win ratchet wheel locking mechanism、Anti-roll back device、Anemometer、Aviation warning light、Tricolor warning light、A series of safety devices such as hydraulic system overflow valve,Ensure the operation safety of the whole machine。
The working condition is appropriate:
● Series multi-way valve-controlled hydraulic system,All actions can be compounded,And that switch between actions is not decelerate.。
● Optional free hook winch,Meet most of the foundation construction requirements。
● One key can realize the switching of main and auxiliary hook working conditions.,More convenient。
Transportation and disassembly optimization:
● A-frame can be self-cocked without oil cylinder,Achieve rapid assembly。
● The weight of a single counterweight shall not exceed 6.25t,Small auxiliary lifting equipment can complete the assembly of counterweight.
Параметр продукта
Item Purpose |
Single Bit |
Number Value |
Remark |
|
**Large lifting torque |
t×m |
209 |
|
|
**Large lifting capacity |
t |
55 |
|
|
Fix the fly jib**Large lifting capacity |
t |
12 |
|
|
Length of main boom |
m |
13~52 |
|
|
Fix the length of the jib |
m |
7~15 |
|
|
**Long main arm+Fix the fly jib |
m |
43+15 |
|
|
Working angle of main boom |
° |
30~80 |
|
|
Mounting angle of fixed jib |
° |
10,30 |
|
|
Lifting mechanism**Large single rope speed |
m/min |
132 |
|
|
Luffing mechanism**Large single rope |
m/min |
82 |
|
|
Swing speed |
rpm |
0~2.45 |
|
|
Travel speed |
km/h |
0~1.65 |
|
|
Gradeability |
% |
30 |
|
|
Ground specific pressure |
MPa |
0.065 |
|
|
Dead weight of complete machine |
t |
49.2 |
Basic arm strap main hook |
|
Counterweight |
t |
17.5 |
|
|
Overall dimension length×Wide×High |
mm |
13000×4600(3120)×3180 |
Including herringbone frame、Bottom segment arm |
|
Engine |
Model |
|
WP6G190E301 |
Weichai Power |
Rated power/Rotating speed |
kW/rpm |
140/2000 |
|
|
**Large output torque/Rotating speed |
Nm/rpm |
860/1300 |
|
|
Emission standards |
/ |
Kunisan |
|
|
Gauge×Grounding length×Shoe width |
mm |
2360×5000×760 |
Retract the track frame |
|
mm |
3840×5000×760 |
The track frame extends |
||
Noise |
Ambient radiated noise during operation |
dB |
≤107 |
|
Noise in the control room during operation |
dB |
≤85 |
|